5 Commits

Author SHA1 Message Date
daniel-c-harvey e6a80b6086 docs(plan): lock P11 11.H decision — additive EntryKey string, track-pattern, migration-time backfill 2026-06-16 12:19:25 -04:00
daniel-c-harvey d899bc9456 docs(plan): add Phase 11 commitment 9 (release GUID identifiers, wave 11.H) 2026-06-16 11:43:11 -04:00
daniel-c-harvey 56e205082d docs(plan): add release Description field as commitment 8 / wave 11.G
Verified no Description column exists on ReleaseEntity/ReleaseDto (mirror
image of commitment 5, which was already built). Specs the new base-release
column + EF migration (Daniel-gated), DTO/converter/write-path plumbing,
CMS multiline input, and detail-page text block. Schema lands as 11.G;
render rides 11.A plus a Session/Mix touch.
2026-06-15 23:38:51 -04:00
daniel-c-harvey e9f4411fdf docs(plan): revise Phase 11 — ordinal, full stack retirement, shared cards, release-share, queue
Fold Daniel's 2026-06-15 decisions into PLAN.md §11 and the product note:
4→7 commitments, six waves. Headline: the track ordinal already shipped
in Phase 8, so commitment 5 is verify-and-consume, not a new migration.
Queue half of §1.3 absorbed; preload stays deferred.
2026-06-15 23:30:28 -04:00
daniel-c-harvey 913861860b docs(plan): shape Phase 11 — Public Site Enhancements
Add Phase 11 to PLAN.md and a full design spec under product-notes:
Cuts gain a /cuts/{id} album detail page; release-title click resolves
medium to a dedicated detail page; redundant /tracks?album view retired;
Archive filters move into the URL. Includes gap analysis and open
questions for Daniel.
2026-06-15 23:09:16 -04:00