daniel 8c65069fc3 docs(phase-q): reconcile gate to S+L3 and add naming-consistency dimension
Correct the Phase Q gate (L2 landed; outstanding is Phase S + Phase L L3;
D2 complete, M9 deferred). Add a grep-verified naming audit (code-organization
§2b) and forks Q-7/Q-8/Q-9; FOREVER-STABLE contract strings excluded.
2026-07-27 03:50:20 -04:00
daniel a20cb46d65 docs: spec Phase Q (Quality) — structural reorganization pillar
Product framing (docs/product/code-organization.md), PLAN.md $Phase Q
(Q-W1..Q-W6), CONTEXT.md $Phase Q. Gated on tree quiescence; zero-hot-path-cost
acceptance bar. Namespace Q settled; Q-2..Q-6 carry recommendations.