Commit Graph

4 Commits

Author SHA1 Message Date
daniel 413967a205 docs: close out Θ-W2-T1 filter-voice-path into COMPLETED
Move the landed filter-voice-path track from PLAN.md into COMPLETED.md with full
narrative (quantizer removal, editor floor raise). Mark Θ-W2 fully landed, matching
W1's phrasing; fix a stale forward reference.
2026-07-30 18:23:42 -04:00
daniel 25c63fb807 docs: close out Θ-W1-T3 and Θ-W2-T2/T3 into COMPLETED; add the filter directory to the architecture map 2026-07-30 11:16:21 -04:00
daniel 99fab6a4b6 docs: move Θ-W1-T1 and Θ-W1-T2 into COMPLETED with recorded deviations 2026-07-30 09:13:56 -04:00
daniel a689fb75eb docs: add PLAN.md — post-1.0 roadmap consolidating TODO-1.0's seventeen items
Two Greek-lettered phases (Θ instrument overhaul, Ξ resample loop): sequenced
waves, parallel tracks on disjoint surfaces, per-track acceptance criteria,
carried-forward open questions, traceability table. TODO-1.0.md retained as
verbatim-provenance appendix.
2026-07-29 23:09:53 -04:00