Commit Graph

7 Commits

Author SHA1 Message Date
daniel 91f71f92bd palette: give the spectral mid and the envelope trace their own roles
Decouples the keyboard strip's mid stop from accent/secondary, which the
deep-teal darkening had inverted. Adds overlay/trace (#816AA6), the first
value to clear 3:1 against the waveform. Replaces the frozen-premise test.
2026-07-31 13:27:20 -04:00
daniel 1f24c4b095 docs: 1.0 documentation restructure
Split root CLAUDE.md into 19 per-directory files scoped to their source area.
Roll v0 history into docs/ARCHIVE.md; retire CONTEXT.md, CONTEXT-ARCHIVE.md,
PLAN.md, COMPLETED.md. Move plan docs under docs/. Rescue 9 live deferrals
into docs/TODO.md.
2026-07-29 15:09:48 -04:00
daniel 85eac37912 docs: close out Phase L L3 — archive to COMPLETED, mark landed in design-language doc
L3 (VST editor + embed-strip restyle) is on dev. Append its COMPLETED entry
and flip visual-design-language.md §5.3/5.4 from GATED to landed / Phase L
complete. PLAN.md + CONTEXT.md L3 edits already landed via the S-VIEW commit.
2026-07-27 12:50:00 -04:00
daniel 5595ba42f9 docs: record settled L3 decision — beta title band stays textual, no channel accent
Daniel (2026-07-27): the S18 beta channel title band gets no distinct
visual accent; L3 restyles it in the standard B pastel palette and the
beta-vs-stable distinction stays purely textual. Closes the one open fork
from the L3 readiness review.
2026-07-27 03:51:47 -04:00
daniel a434ef47f8 docs(plan): ground L3 readiness against landed Phase S surfaces
Both VST draw shells still draw flat off a local pre-L1 palette — L3
restyle confirmed live, not a born-in-kit no-op. Name the concrete gate
files, add the palette-reconcile point, enumerate the landed editor set.
2026-07-27 03:42:24 -04:00
daniel 6fece8d571 docs(product): DS-2 revised — three-accent pastel palette + REAPER-grey neutrals
Replace the single electric-cyan accent with a pastel lime/teal/purple three-accent system; shift neutral surfaces + text from near-black to REAPER's mid-grey theme family. Font upgrade declined (no bundling). L3 conformed to the new look; gate intact.
2026-07-26 21:48:26 -04:00
daniel 22f91ac1d1 docs(product): split look-and-feel into Phase L (L1 kit / L2 panel / L3 VST-restyle)
Port visual-design-language.md to dev with DS-1/2/3 settled (B + spectral
strip; LICE + WDL free game; thorough M11-aware panel layout). L1 shared
kit; L2 panel redesign after M11 merges; L3 VST restyle gated on Phase S
landing. Phase S adopts the kit when it lands — not gated.
2026-07-26 19:36:00 -04:00