Automation ships as Γ-W4; the stage ceiling goes to 10 s in W1-T1 ahead of the
one-way door; a new Γ-W3-T2 corrects Ξ's bake reset list. Four waves, ten tracks.
Opens Γ-F7 on parameter order.
Dynamic latency ships as ruled; the restart cost is re-attributed to our own
setActive and filed in TODO. The reflow splits canvas (W1-T4) from arrangement
(W3-T1); preserve-time-stretch moves to W1-T5.
Collapse Θ-W5 to wave-level in PLAN.md, append its narrative to COMPLETED.md, fix a stale resolvePlay reference in core/instrument/CLAUDE.md, and file the drag-off-margin and AttackEnd/Origin shadow warts in TODO.md.
Note-on latching rejected for continuous controls. New serial track ahead of
staged-envelope-curves (renumbered T2); edit-model and mid-stage-rule questions
left open for Daniel. Records two deferred filter follow-ups.
Move the landed filter-voice-path track from PLAN.md into COMPLETED.md with full
narrative (quantizer removal, editor floor raise). Mark Θ-W2 fully landed, matching
W1's phrasing; fix a stale forward reference.