Commit Graph

4 Commits

Author SHA1 Message Date
daniel bbfb033819 docs(plan): add Phase Q pre-restructure functional+DSP audit wave (Q-W0) 2026-07-27 14:29:56 -04:00
daniel 5ec84ab0eb docs: mark M9 abandoned in Phase Q framing; add L3 + bank_grid/tab_strip to CLAUDE.md
M9 deferred->abandoned in code-organization.md gate (disposition note removed).
CLAUDE.md: L3 identity clause, M9-abandoned line, bank_grid/tab_strip in module
list and targets table.
2026-07-27 12:51:38 -04:00
daniel 8c65069fc3 docs(phase-q): reconcile gate to S+L3 and add naming-consistency dimension
Correct the Phase Q gate (L2 landed; outstanding is Phase S + Phase L L3;
D2 complete, M9 deferred). Add a grep-verified naming audit (code-organization
§2b) and forks Q-7/Q-8/Q-9; FOREVER-STABLE contract strings excluded.
2026-07-27 03:50:20 -04:00
daniel a20cb46d65 docs: spec Phase Q (Quality) — structural reorganization pillar
Product framing (docs/product/code-organization.md), PLAN.md $Phase Q
(Q-W1..Q-W6), CONTEXT.md $Phase Q. Gated on tree quiescence; zero-hot-path-cost
acceptance bar. Namespace Q settled; Q-2..Q-6 carry recommendations.
2026-07-26 20:56:31 -04:00