daniel da14509ab5 Restore the bank fold and usage publish to the resume path, guard setActive against repeats, and make the meter fold's bound literal
The resume also hands back to a full reload when the fold moves the loaded capture's decode source, so the refs table and the audio cannot skew.
2026-08-02 14:06:37 -04:00
daniel 5c6525fb91 Decouple the instrument reload from VST3 activation, and make the master meter's accumulate exact 2026-08-02 14:02:26 -04:00
daniel 4b0b03d8d5 Fix stale post-widen deck-reflow figures (90/144/1190px) across docs and tests, and split test_deck_groups.cpp's width-budget fixtures into a new file. 2026-08-02 13:59:35 -04:00
daniel df10ddacc2 Widen the deck row block to 1028 so the filter tie-line is exact, and accumulate the meter's block peaks instead of sampling one in 47 2026-08-02 13:56:15 -04:00
daniel f60c05c042 docs: collapse Phase Gamma Wave 2 to its landed record, and correct five spec claims the implementation disproved 2026-08-02 13:52:32 -04:00
daniel e7d7e70201 docs: fix stale Gamma payload-rung numbers in instrument-control-surface (v14/v15 -> v15/v16) 2026-08-02 13:52:31 -04:00
daniel 0a7778b396 docs: close Γ-F7 to signal-flow order and spec real units at the host boundary
The 44-id table stated in full. Adds the plain-value layer, a per-category
unit/precision table, the one-formatter invariant, a stepCount sweep, and the
filter read-side resolution.
2026-08-01 18:18:09 -04:00
daniel 2fa55658c1 docs: schedule VST3 parameters into Phase Γ
Automation ships as Γ-W4; the stage ceiling goes to 10 s in W1-T1 ahead of the
one-way door; a new Γ-W3-T2 corrects Ξ's bake reset list. Four waves, ten tracks.
Opens Γ-F7 on parameter order.
2026-08-01 17:26:18 -04:00
daniel 256216d670 docs: close Γ-F6 and resequence Phase Γ into three waves
Dynamic latency ships as ruled; the restart cost is re-attributed to our own
setActive and filed in TODO. The reflow splits canvas (W1-T4) from arrangement
(W3-T1); preserve-time-stretch moves to W1-T5.
2026-08-01 16:51:04 -04:00
daniel eb777f55e1 docs: spec Phase Γ — the instrument's control surface
Two-row deck reflow (sound/contour), double-height MASTER with limiter and
meter, PITCH/RATE deck, unit-driven knob law, contour-trace fix, and a
re-approached loop/crossfade UX. Folds rulings Γ-F1..Γ-F5; opens Γ-F6.
2026-08-01 16:29:32 -04:00