Fold Daniel's decisions into CONTEXT.md, PLAN.md, and the product notes:
- Fork 1 (persistence): pool folds into the `banks` blob; legacy
`bank_index` key retired after a one-way lossless migration.
- Fork 2 (delete): delete drops member index entries; add an `evacuate`
verb (B1 pure op + B3 action) returning members to the pool. Design the
orphaned-until-prune window and confirm-on-non-empty-delete guardrail.
- Fork 3 (move): move is the default gesture, copy the deliberate secondary.
- Fork 4 (active bank): active-bank and shown-tab stay distinct; the
active-bank indicator must be visually unmistakable.
Fork 5 (tab rendering + move affordance) remains open with an options
analysis and pending recommendations. Additive; M0-M11 and Phase D untouched.
Add the multi-bank pillar as Phase B (lettered, parallel to M-line and
Phase D): CONTEXT.md §Multi-bank spec, PLAN.md Phase B block (B1 bank_book
pure / B2 persist / B3 actions / B4 panel split), and docs/product/multi-bank.md
framing. Additive only — BankIndex, the M0–M11 roadmap, and Phase D untouched.
Move completed M7 (wet capture action family) from PLAN.md to COMPLETED.md
with a wet-only decision note; add an M10 forward note that true dry needs
FX-bypass or the realtime pre-FX path, not a render bit.
Move completed M5 (bank_panel: thumbnails, audition, multi-select, keyboard)
to COMPLETED.md and close the thumbnail-cache open question; reword the M4
Save-As identity note to the final GUID-primary/pointer-secondary design.
Move completed M4 (persist) from PLAN.md to COMPLETED.md with a decisions
note (GUID identity, Save-As copy, MarkProjectDirty, known limitation);
update CLAUDE.md repo-identity to M0-M4 complete.
Move completed M3 (offline capture spike) from PLAN.md to COMPLETED.md; close
the render-command and bank-format open questions; add capture_paths_tests to
the CLAUDE.md targets table and note M8 is dialog-free.
Move completed M2 (peaks module) from PLAN.md to COMPLETED.md; add peaks_tests
to the CLAUDE.md targets table and update the pure-core status to M0-M2 done.
Retarget README to ReaSampler and current build targets; reconcile
CLAUDE.md repo-identity + targets table to reaper_reasampler; archive
Milestone 0 from PLAN.md into new COMPLETED.md.
PLAN.md: living 12-milestone roadmap from CONTEXT.md's build order,
each with a verify gate and its precision invariant; open questions
carried forward. TODO.md: near-term M0-M2 slice as ordered tasks.